Working for Carillion PRC on a number of large projects for the Ministry of Defence K Rouse completed the Megiddo scheme that consisted of four separate buildings including workshops, offices and stores.
K Rouse’s works involved earthworks including 31,000m3 of cut and fill, groundworks and floor slabs to the buildings, one of which was 4,500m2, retaining walls and heavy duty rocker slabs designed for offloading tanks.
The drainage element of this scheme consisted of approximately 1,750m of surface water and foul pipework including manholes and interceptors.
The external works package involved 20,000m2 of block paving.