The Megiddo scheme consisted of four separate buildings including workshops, offices and stores.
Our works involved earthworks including 31,000m3 of cut and fill, groundworks and floor slabs to the buildings, one of which was 4,500m2, retaining walls and heavy duty rocker slabs designed for offloading tanks.
The drainage element of this scheme included approximately 1,750m of surface water and foul pipework including manholes and interceptors, the external works package involved 20,000m2 of block paving.
Please complete the below and a member of our team will be in touch to discuss your requirements